Commercial PV Design Considerations

In this article, we describe the key design considerations that go into any commercial system and break them down into four main buckets: authority having jurisdiction (AHJ), utility, building electrical and building structural.

Read more

PV Plan Sets 101

Over the last several years, due in part to generous federal (and in many places local) incentives, solar energy has become an increasingly popular choice with clients who want to offset their home or workplace energy demands. However, the process to go solar isn’t exactly cut-and-dried; there are many preliminary steps to be followed before a client can proceed to take advantage of this green energy source. Chief among them is the development of a PV plan set.

Read more

AC vs. DC Coupling Energy Storage Systems

At Mayfield Renewables, we routinely design and consult on complex solar+storage projects. In this post, we outline the relative advantages and disadvantages of two solar+storage system architectures: AC-coupled and DC-coupled energy storage systems (ESS).

Read more

Five Surprising Uses for PVsyst

To young designers, PVsyst itself can be intimidating with how detailed the simulations are. Given that PVsyst is primarily used for full-scale project design and modeling, new users may overlook the bevy of valuable tools at their disposal within the program. In this post, I outline a few unique ways PV designers can use PVsyst.

Read more

Beyond-Qualification Testing and Project Risk Mitigation

Whether you are fielding distributed solar projects in rooftop applications or large-scale ground-mounted projects in free-field applications, the best locations for solar are inherently high-stress environments that are subject to extreme daily and annual temperature variations, high humidity, dynamic mechanical loads, and long-term ultraviolet (UV) exposure.

Here I provide a conceptual framework for understanding the impetus behind beyond-qualification testing. To illustrate the need for and importance of extended stress-testing regimes, I review some worst-case examples of project losses and perils as a means of exemplifying the project risks that beyond-qualification testing helps to mitigate.

Read more

Six PV Design Tips for Difficult Roofs

In the world of rooftop PV, not all roofs are created equal. Many new and existing buildings have roofs that are ideally shaped, sized, and oriented for solar. All new homes in California are built to be solar-ready. But that’s not the case everywhere. Look around your neighborhood and you’ll likely see plenty of buildings with oddly shaped, heavily shaded, or obstruction-covered roofs. Despite their complexities, these “difficult” roofs present an opportunity for PV designers and contractors alike. In this article, we outline the best practices for designing PV systems on obstructed, space-constrained, or otherwise abnormal commercial roofs.

Read more

PV Connector Mating and Intermatability in NEC 2020

The solar industry’s most dangerous misconception might be the deeply flawed notion of PV connector “compatibility.” As part of the 2020 round of revisions, the Code-Making Panel responsible for Article 690 in the National Electrical Code introduced language intended to reduce performance and safety risks associated with PV module connectors. Industry stakeholders would be wise to plan ahead for the eventual adoption of these seemingly small yet consequential changes. Here is a brief overview of the problem, relevant Code requirements, and ways to mitigate risks.

Read more

Analyzing the 2% DC Voltage Drop Rule

The solar industry is often referred to as the “solar coaster” due to its seemingly constant changes as equipment manufacturers innovate, permitting requirements fluctuate, electrical codes update, and new policies become mandate. But, like in any industry, some unwritten rules find a way to stand the test of time. In this article we will analyze one of those, the 2% DC voltage drop assumption, to see if it’s still pertinent to PV projects today.

Read more

How to Calculate PV String Size

How to manually calculate PV string size for photovoltaic systems based on module, inverter, and site data. Design code-compliant PV systems and follow design best practices.

Read more

We turn technical complexity
into performance certainty.

Ready to move your project forward? Contact our engineering team today.

Contact us