Code Corner: Energy Management Systems (2023 NEC 705.13)

In the 2023 National Electrical Code updates, code now defines Energy Management Systems (EMS) and emphasizes a system’s role in controlling both loads and power generation sources to ensure busbars are operating safely. The revised 705.13, in conjunction with 750.30, provides an opportunity for a more streamlined and efficient system design. Whether you’re aimed at […]

Read more

Code Corner: 2023 NEC Article 690.31(C) and (C)(2) Cable Tray

In this installment of our Code Corner series, Ryan Mayfield focuses on the 2023 National Electrical Code (NEC) changes concerning cable trays, particularly section 690.31 (C). Historically, the NEC has allowed cable trays, but has lacked specific guidelines for sizing conductors and using smaller conductors like PV wire and DG cable on rooftops. The 2023 […]

Read more

Code Corner: NFPA 70B Infrared Thermography

Infrared thermography, while not new to NFPA 70B, now has detailed guidelines for its use in assessing  PV systems. Chapter 30 of the 2023 update explicitly extends the use of this maintenance and assessment tool to photovoltaic (PV) systems — whether you’re evaluating electrical terminations, grounding and bonding, PV strings, modules, or module interconnections. New […]

Read more

Code Corner: 2023 NEC Article 691 Large-Scale PV

In this installment of our Code Corner series, Ryan Mayfield takes up the scope, special requirements, and engineering design for large-scale PV systems not owned and operated by utilities (i.e., 2023 NEC Article 691). Section 691.4 enumerates key compliance details – access, markings, voltage ranges, monitoring – for PV systems with a minimum of 5 […]

Read more

Code Corner: Insulation Resistance Testing, 2023 NFPA 70B

In 2023, for the first time,  the National Fire Protection Agency (NFPA) explicitly included photovoltaic (PV) systems in their Standard for Electrical Maintenance Handbook. In our most recent episode of Code Corner, Ryan Mayfield opens up 2023 NFPA 70B to analyze one of the crucial tests prescribed in Chapter 30, the insulation resistance test. Even […]

Read more