Code Corner: 2020 NEC 705.12(B)(3)(1) and (2)

This particular Code Corner is all about NEC 705.12(B)(3), which adjudicates best practices for any power system’s busbar interconnections and breakers.  For the sake of illustration, we focus in this article on bus or conductor ratings as they pertain specifically to solar PV or PV-plus-storage systems. What does NEC 705.12(B)(3) say? The 2020 National Electrical […]

Read more

PV Disconnect Placement per NEC 2017 Article 690.1

Engineers, designers, installers, and manufacturers need to stay on top of jurisdictional code changes to ensure their products and systems will operate safely. Local regulations will vary, but there is perhaps no code more important to photovoltaic (PV) manufacturers, designers, and installers than the National Electrical Code (NEC) Article 690, which provides electrical requirements for solar PV systems. In this post, we will outline the 2017 Code updates as they pertain to PV system disconnects.

Read more

How to Calculate PV String Size

How to manually calculate PV string size for photovoltaic systems based on module, inverter, and site data. Design code-compliant PV systems and follow design best practices.

Read more

We turn technical complexity
into performance certainty.

Ready to move your project forward? Contact our engineering team today.

Contact us