Education & Training

Education & Training

Creating the next generation of industry experts

Learn from accomplished trainers

Build code-compliant solar+storage systems

Improve performance with best practices

Online Learning

A library of self-paced courses to elevate your knowledge

Access our accumulated insights on solar and energy storage-related codes and standards, including the latest updates on the National Electrical Code®, fire codes, and more.

Private Workshops

Interactive seminars delivered by our subject-matter experts

These engaging, informative lessons are designed for audiences of all knowledge levels—and include sessions that qualify for NABCEP continuing education units.

Education Summit

Our flagship educational event to build a resilient energy future

Gathering industry professionals, stakeholders, and educators, our Education Summit delivers best-in-class training for a growing and increasingly complex sector.

“Mayfield believes we have a shared interest and responsibility in educating the next generation of industry experts.”

Lucas Miller

Senior Engineering Consultant

Technical Articles & Case Studies

  • Case Study

    Turning a Town Hall into a Microgrid

    Mt. Hood Town Hall is a community gathering place in the Upper Hood River Valley. It acts as a recycling center, community meals distribution hub, middle-school classroom, a venue for special public events, and a relief center during emergencies. Originally built in 1914 and owned by Hood River County, the facility is a registered historic building.

    Due to its geography, Hood River County faces unique outage-inducing events including wildfires, ice storms, earthquakes, high temperatures, and high winds. Much attention was drawn to this in 2018, when the Hood River County Energy Plan was adopted, making energy resilience a top priority.

    Fast forward to September 2023: With a specific site for a microgrid in mind and a list of resiliency goals in hand, Hood River County received a grant from the Oregon Department of Energy’s Community Renewable Energy Grant Program to fully fund a microgrid feasibility study for the proposed project.

    Read on: Turning a Town Hall into a Microgrid
  • Codes and Standards

    BESS Maximum Allowable Quantities at the C&I scale

    When installing a battery energy storage system (BESS) in a behind-the-meter project, what is the maximum size allowed in a single fire area? For the vast majority of commercial and industrial (C&I) BESS projects, say 100 kWh to 10 MW…

    Read on: BESS Maximum Allowable Quantities at the C&I scale
  • Engineering Best Practices

    Case Study: Building Solar-plus-Storage for a Multipurpose Arena

    When you’re planning a 7,500-seat arena in an area with high electricity rates and a lot of sunshine, it’s a good idea to start thinking about solar panels and storage systems.  That’s exactly what the team behind Frontwave Arena did…

    Read on: Case Study: Building Solar-plus-Storage for a Multipurpose Arena